
The process is similar to flat roofs, with the addition of sealing around tiles.
Use a 450mm lead flashing tape around the upstand to seal it to the roof tiles.
Maximum pitch angle: 45 degrees.


Sill Flashing: Secure the bottom flashing piece with roofing nails and cover with shingles.
Step Flashing: Install L-shaped flashing starting from the bottom, overlapping with each layer.
Counterflashing: Fit over the step flashing to prevent water ingress.
Saddle Flashing: Install at the top under shingles, securing with roofing nails.